12
Main Zone 1-4 m thick but
continuous along 700 m strike
length and to depth
Mineralization open to depth – ie:
7.0m @9.27% Cu – 1,200 m depth
Possible parallel zones (see
exploration)
*Roscoe Postle Associates Report for CBay, July 9,
2012
CBay Production Potential: Corner Bay
Resource calculation (2012 43-101 using 2%
Cu cutoff*)
Measured: 360,000 tonnes @3.44% Cu
Indicated: 465,000 tonnes @ 3.40% Cu
Inferred: 734,000 tonnes @3.33% Cu